Things to Do
Home About Us The Boat Log of Imagine Photo Gallery Links Where are we now?

 

Up

Task Description

Status (%)

Priority

Category

Est. hours

new mast boot

100

1

Leak

2

replace leaking freeze plug in engine

1

Engine

repair stanchions

1

Deck

16

re-bed toerail cap

1

Deck

24

Replace all standing rigging

1

Rigging

32

rebed all portlights

1

Deck

8

seal anchor windlass - new base? (stiffer)

1

Deck

8

replace aft head, install holding tank

1

Plumbing

8

Repair sails

1

16

de-rust engine

2

Engine

8

pull engine head for re-build

2

Engine

16

inspect chainplates / rebed

2

Deck

8

New bases for boom gallows (or eliminate?)

2

Deck

4

modify for 2nd anchor roller

2

Deck

4

install batteries (build shelf, new wiring) in keel

2

Electrical

16

finish cockpit coaming (pull teak, glass, fair, paint)

2

Deck

24

make shower into a pantry (shelves)

2

Woodwork

8

replace genoa sheet car track

2

6

make / mount dinghy chocks

2

6

new countertops in galley

2

Woodwork

8

install galley stove

2

Woodwork

4

rubstrakes for stern lines

3

Deck

1

re-plumb freshwater system

3

Plumbing

6

new sani hose for forward head

3

Plumbing

2

rewire engine harness

3

Engine

16

install batteries in lazarettes

3

Electrical

8

rebuild / replace electrical panel?

3

Electrical

16

Install SSB, modem

3

Electrical

8

make new hatch boards

3

Deck

8

shelves for aft cabin

3

16

clean up and paint back of shelves (liner? carpet?)

4

Interior

8

divide anchor locker for 2nd rode

4

Woodwork

8

clean out fuel tanks

4

Engine

8

clean out water tanks

4

Plumbing

4

install lights in engine room

4

Electrical

2

rework hanging lockers fwd for shelves

4

Woodwork

4

rework refrigeration

4

Mechanical

16

install galley footpump

4

Plumbing

4

Re-work hatches - overhead - new lexan, lift cylinders

4

Deck

8

remove /clean / inspect waterheater

5

Plumbing

2

rebuild waterheater shelf

5

Woodwork

6

rework area under v-berth for more storage

5

Woodwork

16

rewire engine room

5

Electrical

16

insulate/soundproof engine room

5

Engine

8

paint deck / nonskid and hatches

5

Deck

rebed all deck hardware

5

Deck

16

rebuild area behind freezer into comm. center

5

Woodwork

16

Move VHF to new nav station

5

Electrical

4

Teak laminate for salon table

6

Woodwork

16

mount mast steps

6

Rigging

4

new faucet for aft head

6

Plumbing

3

revarnish interior / floors

9

move battery charger / remove old charger

10

Electrical

2

rework drawers under settee (?)

10

Woodwork

new (larger/deeper) drawers in the galley? (?)

10

Woodwork

new F/W hoses

10

Plumbing

strip wallpaper and paint walls?

10

install holding tank for forward head?

X

11

Plumbing

repair rot around starb primary cleat (or leave wood off coaming)

X

11

Sail repair seminar

16

slipcover settee cushions

sheets for berths

Total Hours

494