Task Description |
Status (%) |
Priority |
Category |
Est. hours |
new mast boot |
100 |
1 |
Leak |
2 |
replace leaking freeze plug in engine |
|
1 |
Engine |
|
repair stanchions |
|
1 |
Deck |
16 |
re-bed toerail cap |
|
1 |
Deck |
24 |
Replace all standing rigging |
|
1 |
Rigging |
32 |
rebed all portlights |
|
1 |
Deck |
8 |
seal anchor windlass - new base? (stiffer) |
|
1 |
Deck |
8 |
replace aft head, install holding tank |
|
1 |
Plumbing |
8 |
Repair sails |
|
1 |
|
16 |
de-rust engine |
|
2 |
Engine |
8 |
pull engine head for re-build |
|
2 |
Engine |
16 |
inspect chainplates / rebed |
|
2 |
Deck |
8 |
New bases for boom gallows (or eliminate?) |
|
2 |
Deck |
4 |
modify for 2nd anchor roller |
|
2 |
Deck |
4 |
install batteries (build shelf, new wiring) in keel |
|
2 |
Electrical |
16 |
finish cockpit coaming (pull teak, glass, fair, paint) |
|
2 |
Deck |
24 |
make shower into a pantry (shelves) |
|
2 |
Woodwork |
8 |
replace genoa sheet car track |
|
2 |
|
6 |
make / mount dinghy chocks |
|
2 |
|
6 |
new countertops in galley |
|
2 |
Woodwork |
8 |
install galley stove |
|
2 |
Woodwork |
4 |
rubstrakes for stern lines |
|
3 |
Deck |
1 |
re-plumb freshwater system |
|
3 |
Plumbing |
6 |
new sani hose for forward head |
|
3 |
Plumbing |
2 |
rewire engine harness |
|
3 |
Engine |
16 |
install batteries in lazarettes |
|
3 |
Electrical |
8 |
rebuild / replace electrical panel? |
|
3 |
Electrical |
16 |
Install SSB, modem |
|
3 |
Electrical |
8 |
make new hatch boards |
|
3 |
Deck |
8 |
shelves for aft cabin |
|
3 |
|
16 |
clean up and paint back of shelves (liner? carpet?) |
|
4 |
Interior |
8 |
divide anchor locker for 2nd rode |
|
4 |
Woodwork |
8 |
clean out fuel tanks |
|
4 |
Engine |
8 |
clean out water tanks |
|
4 |
Plumbing |
4 |
install lights in engine room |
|
4 |
Electrical |
2 |
rework hanging lockers fwd for shelves |
|
4 |
Woodwork |
4 |
rework refrigeration |
|
4 |
Mechanical |
16 |
install galley footpump |
|
4 |
Plumbing |
4 |
Re-work hatches - overhead - new lexan, lift cylinders |
|
4 |
Deck |
8 |
remove /clean / inspect waterheater |
|
5 |
Plumbing |
2 |
rebuild waterheater shelf |
|
5 |
Woodwork |
6 |
rework area under v-berth for more storage |
|
5 |
Woodwork |
16 |
rewire engine room |
|
5 |
Electrical |
16 |
insulate/soundproof engine room |
|
5 |
Engine |
8 |
paint deck / nonskid and hatches |
|
5 |
Deck |
|
rebed all deck hardware |
|
5 |
Deck |
16 |
rebuild area behind freezer into comm. center |
|
5 |
Woodwork |
16 |
Move VHF to new nav station |
|
5 |
Electrical |
4 |
Teak laminate for salon table |
|
6 |
Woodwork |
16 |
mount mast steps |
|
6 |
Rigging |
4 |
new faucet for aft head |
|
6 |
Plumbing |
3 |
revarnish interior / floors |
|
9 |
|
|
move battery charger / remove old charger |
|
10 |
Electrical |
2 |
rework drawers under settee (?) |
|
10 |
Woodwork |
|
new (larger/deeper) drawers in the galley? (?) |
|
10 |
Woodwork |
|
new F/W hoses |
|
10 |
Plumbing |
|
strip wallpaper and paint walls? |
|
10 |
|
|
install holding tank for forward head? |
X |
11 |
Plumbing |
|
repair rot around starb primary cleat (or leave wood off
coaming) |
X |
11 |
|
|
Sail repair seminar |
|
|
|
16 |
slipcover settee cushions |
|
|
|
|
sheets for berths |
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
494 |